Norled, Bygg nr. 47 & 48 ved GS Marine, Passasjerkatamaraner "Fjordled" & "Fjordøy"

Refvik

Administrator
Staff member
Ser at Kolumbus er ute med tender på hurtigbåt på Røvær og Feøy

"Oppdragsgiver har til hensikt å anskaffe tjenester for rutekjøring med hurtigbåt på Røvær og Feøy. Oppstart rutekjøring er 1. januar 2019.

Oppdragsgiver vil i første trinn kvalifisere leverandører, for deretter å invitere kvalifiserte leverandører til å inngi tilbud i andre trinn."
 
Tidligere har det vert kjent at GS Marine skal bygge to båter for Norled for desse rutene, kor den eine skal være en hybridbåt
Norled.jpg

Illustrasjon: GS Marine
 
Technical specifications for the 24m catamarans:
  • Diesel engines: 2 x Volvo DI13 070M
  • EL-motors: 2 x 85 kW @ 2000rpm
  • Engine power/rpm: 2 x 404kW @ 1800 rpm
  • Power bank: 100 kWh
  • Gearbox and configuration: Servogear HDE220 – H (in line)
  • Reduction ratio: 2,952:1
  • Propeller diameter: 1075 mm
  • Propeller shaft diameter: Ø80 mm
  • Propeller shaft angle: 5,0 deg
  • Manoeuvring and hybrid electro system: Triton hybrid package from Brunvoll Mar-El
  • Class approval: DNV GL HSLC
upload_2017-11-15_7-26-34.png
 
Servogear Hybrid CPP for the World’s First Hybrid Catamarans in Commercial Traffic
1188.orig.5cdfb399fab4dd36a8fb87d12ba523b7.jpg


14.11.2017
Norled AS has ordered two pioneering 24m hybrid catamarans from the Norwegian shipyard GS Marine. Norled has chosen to equip both vessels with a complete plug in hybrid Servogear Ecoflow PropulsorTMsolution. This will be the world’s first hybrid catamarans used in commercial traffic.

Naval Architect, Ingebjørn Aasheim, has designed the vessel on behalf of GS Marine. The catamarans will be built in light weight carbon sandwich, and operating at 20 knots.

From January 1st, 2019 the two vessels will be accommodating 86 passengers in two different routes in Røværsambandet, Norway:

1: Haugesund- Røvær: Driving with a hybrid installation.
2: Feøy- Haugesund – Kveitevik: Driving with diesel, prepared to be fitted with a hybrid installation.

Norled AS is one of Norway’s largest ferry and express boat operators. Norled are known for having invested significantly in new types of vessels and eco-friendly technology.

The hybrid catamans will use batteries when driving close to shore. Up to a certain speed, the gearboxes with electro motors will be powered by batteries. The diesel engines will be used to achieve top speed.

The first CPP integrated plug in hybrid solution on the market
"This is a unique project that we are very proud to be a part of. The Servogear installation will be the first completely CPP integrated plug in hybrid solution on the market. The HDE220 hybrid gearbox will have its world premiere on the two Norled catamarans. The new gearbox is built on the well proven technology of the HD220 gearbox, combined with the latest electronic technology", said Otto Pedersen, Servogear Sales & Marketing Director.
1192.219.9235ebdf91a0578891bbedb93a1ee369.png




Servogear will be delivering the total hybrid propulsion package, with propellers, effect rudders, hybrid gearboxes with electro motors, and the design of the propeller tunnels. The hybrid solution package has been developed in cooperation with Brunvoll Mar-El, where they have designed and will be delivering the control systems, power management and batteries to the project. The development of the equipment is supported by Innovation Norway.

"The operator can choose to drive electrically in city harbours, causing zero local emissions. Compared to a conventional CPP propulsion line, the hybrid solution results in operational cost savings and a lifetime extension for the main engine (TBO). It is also a significant step towards achieving a green vessel profile, reducing NOx and CO2 emissions", Pedersen finishes.

Technical specifications for the 24m catamarans:
  • Diesel engines: 2 x Volvo DI13 070M
  • EL-motors: 2 x 85 kW @ 2000rpm
  • Engine power/rpm: 2 x 404kW @ 1800 rpm
  • Power bank: 100 kWh
  • Gearbox and configuration: Servogear HDE220 – H (in line)
  • Reduction ratio: 2,952:1
  • Propeller diameter: 1075 mm
  • Propeller shaft diameter: Ø80 mm
  • Propeller shaft angle: 5,0 deg
  • Manoeuvring and hybrid electro system: Triton hybrid package from Brunvoll Mar-El
  • Class approval: DNV GL HSLC
Kilde: Servogear.no
 
Ser ut til at namna på desse to blir "Fjordled" & "Fjordøy" og ikkje "Gitterøy" som tidligere trudd for den eine...
 
20 knop i marsfart er jo et signifikant fall fra normalen hva gjelder hurtigbåter. Greit nok at man prøver finne linken mellom el/hybrid-teknologi og dagens hurtigbåter, men om differansen er så stor, så må En jo spørre seg selv om dette er "liv laget". Hurtigbåter opererer normalt med 30 knop pluss, og i noen tilfeller på 20-tallet, men når nyeste hurtigbåter av hybridteknologi snakker om såvidt over 20 knop så er man nede på fergenivå realistisk sett, og det er jo meget betenkelig og direkte tragisk...
 
Ser ut til at "Fjordled" blei overlevert 2. april, og satt i rute allerede ut fra Haugesund?
showphoto.aspx

Foto: Asbjørn Sjøvoll via MarineTraffic.com
 
Dette er Norges første hybride hurtigbåt

Båten skal tilfredsstille fremtidens enda strengere miljøkrav, melder Norled.

I dag gikk startskuddet for ferge- og hurtigbåtrederiet Norleds nyvinning.

Hurtigbåten M/S «Fjordled» er Norges første hybride hurtigbåt. Det betyr at den skal benytte seg av elektrisk fremdrift i havneområdene.

– Dette er en milepæl i forhold til miljøforbedring på hurtigbåt, med fremtidsrettede løsninger som slipper ut 80 prosent mindre NOx enn den forrige båten som trafikkerte ruten mellom Haugesund og Røvær, forteller regionsjef for hurtigbåter i Norled, Bjørn Egil Søndenå.

Kutter utslippene med ti prosent

Båten kan ta i mot 89 passasjerer på hver tur, og skal kunne tåle inntil 3.5 tonn med last på dekk. Fartøyet er 24 meter lang og 7 meter bred.

Båten er bygget ved verftet GS Marine og har utstyr fra blant andre Brunvoll og Servogear. Batteripakkene er levert av selskapet Greenland Energy.

Les meir på sidene til Sysla Maritim (Krever innlogging)

"Fjordled"
Hurtigba%CC%8Ater-interi%C3%B8r_Fjordled_IMG_9789-1024x576.jpg

Foto: via Norled
 
Back
Top